Tunnel Project - INDUSTRY - DAHOO Engineering
HELLO, WELCOME TO DAHOO WEBSITE!
Search
INDUSTRY
Tunnel Project
 

Tunnel project is the underground work. For safety and to get rid of fire risk, flame retardant conveyor belts needed.The requirement of flame retardant of the belts is not the same as coal mining.



DAHOO design and produce this belts as per EN 14973 Clause A specially for Tunnel project with long work life.


 Producuts  Features  Standards  Range (Max.width =2200mm)
 VULCAN Tunnel  Fire Resistant & Anti static EN14973 Clause A

 ST belting : ST500~ST6300 N/mm

 

  • If Detail Datasheet Needed , Please Contact Us.

 

Last:Quarry and Aggregate

Next:Recycling and Waste treatment

The member of ISO TC41 SC3 and China Standard Committee of Belting ,Fire resistant Committee of China Coal Mining Safety Technology

Copyright 2018 DAHOO Engineering Tech . All Rights Reserved.Support:Chuangshi